The Great Mississippi River Race for
Rett Syndrome, May 2001


Building the Double Helix
Wood Stripping

(First page of four for Wood Stripping)


Previous Set of Pictures
(Mold Construction)
Next Set of Pictures
(Wood Stripping, second page)

 

The first strip, made up of a black walnut and pine, was positioned at the sheer line.

More strips, each with one edge rounded to fit into a cove along the edge of another strip, were added one at a time.

Glue, nails and a clamping system that used rubber bands cut from an old truck tire's inner tube were needed to ensure a tight fit.

The strips alternate sides as they cross the ends (stern shown).

Stripping toward the center line from both sides, ready for a center king strip of black walnut and ash.

A center king strip of black walnut-ash-ash-black walnut was made and fitted.

 

More strips were fitted to complete the bottom of the hull

Previous Set of Pictures
(Mold Construction)
Next Set of Pictures
(Wood Stripping, second page)

Legal Copyright: The Great Mississippi River Race For Rett Syndrome, 2001. All Rights Reserved
Catch Another Great! Adventure at The Mississippi River Challenge for Rett Syndrome and Leukodystrohpy, May 2003!